DEMO MODE — SAMPLE DATA ONLYNothing here can contact a company, send an email, change a real account or create a production record. Preview actions reset when this page is reloaded.
Exit demo · real account login
CONCEPT / SYNTHETIC DEMO / NOT LIVE CUSTOMER DATAThis role selector changes a local preview only. It grants no account, project or database permission. Reloading starts a fresh synthetic scenario.

CompositeBid Factory Pilot

Carbon Fibre Floor Assembly

One secure project model, shaped for the person using it.

Staging concept
Demo setup · Supplier / Company · change role or device
ProjectCarbon Fibre Floor Assembly
ReferenceDEMO-CFFA-001
Order quantity40
Finished12 / 40

Signed-in device setup · synthetic preview

What is this user working on?

Choose a device preview. In this synthetic demo it also opens the matching role projection. A real signed-in user can only open views granted by their identity, company role and project assignment.

Paper or digital execution

Preview only — not saved company settings. Device size does not choose how work is approved.

Changing this preview never approves paper records, clears holds or creates electronic signatures. Existing local job, quantity and time state is retained.
CompositeBidDemo Composite FactorySynthetic role preview · Supplier / Company · not the signed-in account
Synthetic session

Signed-in dashboard preview

Supplier / Company

Factory overview and programme health

Synthetic

Live upstairs view · Day shift

What is happening now

Act first

Needs attention

Blocked

Rear Floor

8 parts blocked

RH Floor Mould repair required · 2 people affected

Needs labour

LH Tunnel

OP50 · Trim

Needs 1 authorised operator

Quality hold

Bonded Assembly

4 parts awaiting inspection

Quality decision required before final release

Today / this shift

Days · 8 scheduled

Working6
Awaiting work1
Unavailable1

At a glance

Work status

Working
10
Awaiting work
5
On hold
1
Inspection
1

Current load

Work by operation

8Mould Prep
10Layup
8Cure
6Trim
4Inspection

Named work

Who is on what

PersonProject / PartOperationProgressPriorityStatus
DaysFront FloorCF-FLR-023 · Front Floor PanelOP30Ply Layup6 / 10P1In progress
NightsRear FloorCFFA-RF-110OP40Cure0 / 8P1On hold
UnassignedWeekendsLH TunnelCFFA-LHT-120OP50Trim0 / 6P2Awaiting work
DaysBonded AssemblyCFFA-ASSY-200OP60Final inspection0 / 4P1Inspection
DaysFairing SetDEMO-FAIR-010 · Fairing PanelOP70Paint preparation3 / 5P2In progress

Simple status only

Moulds / tools

  • LH Floor MouldFront Floor · 10 parts
    Mould Prep
  • RH Floor MouldRear Floor · 8 parts blocked
    Repair Required

Batch, allocation and out-life

Materials register

  • Available
  • Shortage
  • Waiting on customer-supplied material
  • Available
  • Available

Tablet barcode station · synthetic

Scan job or material

A recognised code fills the matching controlled job or material record without retyping it.

Scan a job traveller or material label.Camera decoding stays on the device. This synthetic demo makes no stock, issue, labour or production transaction.

Same project data · authorised exposure

Supplier internal view

DEMO-CFFA-001 · Carbon Fibre Floor Assembly

  • George is Team Leader; John Carter is assigned to OP30 Ply Layup.
  • Exact operations, shifts and handover revision snapshots are visible.
  • RH Floor Mould requires repair; internal engineering action is open.
  • ADH-FILM-08 shortage and the internal Quality/NCR investigation are visible.

The customer projection is a subset of this one synthetic project. Operator names, exact operations, mould investigation and internal NCR detail are not returned to the buyer.

Staging-only visual

Device readiness

Secure device registeredPilot tablet 03
Internet connectedLast check just now
CameraOptional · company controlled
NotificationsEnabled for assigned work
Offline documentsControlled preview only · deep offline not implemented
Current revision validationRequired before work proceeds

Local synthetic state only. No database call, email, invitation, file release, Scout action or production mutation can be made from this demo.